A platform for research: civil engineering, architecture and urbanism
Baldwin filtration plant, Cleveland, Ohio
Filtration plant having capacity of 165,000,000 gal. per day; details of reservoir control works, chemical house and mixing flumes, etc., with special reference to hydraulic jump section; administration and filter building; covered reservoir 1035 ft. by 550 ft. by 40 ft. high; filters and effluent galleries and filter equipment; detailed costs totaling $6,766,000. (See also - discussion no. 7, Sept. 1930, pp. 1727-1728; Water Works and Sewerage, vol. 72, no. 2, Feb. 1930, pp. 43-44, 2 figs.)
Baldwin filtration plant, Cleveland, Ohio
Filtration plant having capacity of 165,000,000 gal. per day; details of reservoir control works, chemical house and mixing flumes, etc., with special reference to hydraulic jump section; administration and filter building; covered reservoir 1035 ft. by 550 ft. by 40 ft. high; filters and effluent galleries and filter equipment; detailed costs totaling $6,766,000. (See also - discussion no. 7, Sept. 1930, pp. 1727-1728; Water Works and Sewerage, vol. 72, no. 2, Feb. 1930, pp. 43-44, 2 figs.)
Baldwin filtration plant, Cleveland, Ohio
Am. Soc. Civil Engrs. -- Proc
Ellms, J.W. (author) / Hamlin, G.W. (author) / Levy, A.G. (author) / Linders, J.E.A. (author)
1930
60 pages
18 Figs
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Baldwin Filtration Plant, Cleveland, Ohio
ASCE | 2021
|Baldwin filtration plant, Cleveland, Ohio
Engineering Index Backfile | 1931
|Baldwin filtration plant, Cleveland, Ohio
Engineering Index Backfile | 1930
|