A platform for research: civil engineering, architecture and urbanism
Seattle's concrete pavements cured with continuous sprinkler
City specifications require continuous curing for 10 days; either sprinkling or ponding permitted, but former is more economical; sprinkler head designed especially for paving work; cost data.
Seattle's concrete pavements cured with continuous sprinkler
City specifications require continuous curing for 10 days; either sprinkling or ponding permitted, but former is more economical; sprinkler head designed especially for paving work; cost data.
Seattle's concrete pavements cured with continuous sprinkler
Concrete
Faulkner, H.F. (author)
Concrete ; 37
1930
2 pages
4 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1954
|Engineering Index Backfile | 1961
|Seattle's Transportation Transformation
British Library Online Contents | 2017
|Engineering Index Backfile | 1940
|Engineering Index Backfile | 1954
|