A platform for research: civil engineering, architecture and urbanism
Rock asphalt construction in cold weather
Direct steam heating to facilitate unloading and laying of rock asphalt at low temperatures; spacing of jets; steaming time; coal consumption; steaming equipment.
Rock asphalt construction in cold weather
Direct steam heating to facilitate unloading and laying of rock asphalt at low temperatures; spacing of jets; steaming time; coal consumption; steaming equipment.
Rock asphalt construction in cold weather
Highway Engr. Contractor
Ferguson, S.F. (author)
1930
3 pages
2 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1930
|Cold asphalt road construction
Engineering Index Backfile | 1936
|Cold asphalt road construction
Engineering Index Backfile | 1936
|Cold weather construction methods
Engineering Index Backfile | 1956
|Cold-mix rock asphalt production and roadbuilding
Engineering Index Backfile | 1924