A platform for research: civil engineering, architecture and urbanism
Fighting muck on a northern Indiana road job
Report on building of concrete road over lake sand and muck beds near East Gary, Ind.; excavation, dynamite and fill used; grade and form setting; concreting; curing of pavement; flexural strength tests.
Fighting muck on a northern Indiana road job
Report on building of concrete road over lake sand and muck beds near East Gary, Ind.; excavation, dynamite and fill used; grade and form setting; concreting; curing of pavement; flexural strength tests.
Fighting muck on a northern Indiana road job
Contractors Engrs. Monthly
Smith, B.R. (author)
1930
5 pages
14 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Wiley | 2012
|Construction site temporary road construction method based on muck
European Patent Office | 2023
|Muck road base structure of solidified household garbage incinerator
European Patent Office | 2023
|Muck storage and outflow recording equipment for muck management
European Patent Office | 2022
|