A platform for research: civil engineering, architecture and urbanism
Problems in driving piling
Problems of driving 120-ft. Douglas fir piling for Ford Motor Company's assembly plant at Edgewater, N. J.; use of air-driven cross-cut saws.
Problems in driving piling
Problems of driving 120-ft. Douglas fir piling for Ford Motor Company's assembly plant at Edgewater, N. J.; use of air-driven cross-cut saws.
Problems in driving piling
Constructor
Constructor ; 12
1930
2 pages
4 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1932
Driving sheet piling by compressed air
Engineering Index Backfile | 1925
|Practical pointers on driving steel sheet piling
Engineering Index Backfile | 1937
|