A platform for research: civil engineering, architecture and urbanism
Chicago concrete building presents difficult foundation problems
Difficulties in pile and concrete foundation work in construction of new office building for Montgomery Ward and Co., proximity to river introduces complications; rigid frame concrte bents used for part of roof; details of hipped-roof skylight; details of concrete-lined vehicular tunnel, 14 ft. by 8 ft. in cross-section, leading to adjacent building.
Chicago concrete building presents difficult foundation problems
Difficulties in pile and concrete foundation work in construction of new office building for Montgomery Ward and Co., proximity to river introduces complications; rigid frame concrte bents used for part of roof; details of hipped-roof skylight; details of concrete-lined vehicular tunnel, 14 ft. by 8 ft. in cross-section, leading to adjacent building.
Chicago concrete building presents difficult foundation problems
Eng. News-Rec
Berkenbilt, S.E. (author)
Engineering News-Record ; 104
1930
4 pages
5 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Building above steam operation presents problems
Engineering Index Backfile | 1938
Building above steam operation presents problems
Engineering Index Backfile | 1938
Difficult foundation problems connected with soil stabilization
Engineering Index Backfile | 1966
|Foundation construction of the Chicago daily news building
Engineering Index Backfile | 1928
Foundation caused collapse of old Chicago club building
Engineering Index Backfile | 1928
|