A platform for research: civil engineering, architecture and urbanism
New international bridges, between Canada and United States
Two systems described; one consists of varied series of bridges crossing St. Lawrence at Thousand Islands; total cost estimated at £ 404,000; other is Blue Water International Bridge crossing St. Clair River, 1 1/4 mi in length, erected at cost of £400, 000; international portion consists of main span of 871 ft of arched cantilever form, and two anchor arms, each 326 ft. (See also Engineering v 146 n 3798 Sept 23 1938 p 377-9; Engineer v 166 n 4314 Sept 16 1938 p 315-6 and 310)
New international bridges, between Canada and United States
Two systems described; one consists of varied series of bridges crossing St. Lawrence at Thousand Islands; total cost estimated at £ 404,000; other is Blue Water International Bridge crossing St. Clair River, 1 1/4 mi in length, erected at cost of £400, 000; international portion consists of main span of 871 ft of arched cantilever form, and two anchor arms, each 326 ft. (See also Engineering v 146 n 3798 Sept 23 1938 p 377-9; Engineer v 166 n 4314 Sept 16 1938 p 315-6 and 310)
New international bridges, between Canada and United States
Can Engr
Canadian Engineer ; 75
1938
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
New international bridges, between Canada and United States
Engineering Index Backfile | 1938
New international bridges, between Canada and United States
Engineering Index Backfile | 1938
New international bridges, between Canada and United States
Engineering Index Backfile | 1938
TECHNICAL PAPERS - Integral Abutment Bridges: Current Practice in United States and Canada
Online Contents | 2000
|