A platform for research: civil engineering, architecture and urbanism
Auxiliary suspension bridge was built for purpose of transporting gravel and concrete aggregates by means of concrete pump from right bank to left bank of river.
Pumping concrete for construction of reinforced concrete bridge 145 m in length
Pumpbeton zur Herstellung einer Flussbruecke
Press (author)
Zement ; 27
1938
2 pages
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Plastic Hinge Length of Reinforced Concrete Bridge Columns
British Library Conference Proceedings | 2002
|Plastic Hinge Length of Reinforced Concrete Bridge Column
British Library Conference Proceedings | 2001
|The development of reinforced concrete bridge construction
Engineering Index Backfile | 1925
|Construction of a small reinforced-concrete bridge
Engineering Index Backfile | 1929
|Pumping concrete for dam construction
Engineering Index Backfile | 1934
|