A platform for research: civil engineering, architecture and urbanism
Previsions et observations des tassements pour deux immeubles recents a Geneve
Prediction and observation of settling of two buildings in Geneva (Switzerland); calculations of subsoil settling were performed utilizing methods of Terzaghi and Kany, and observations as well as interpretation of data were done according to method developed by H. Neuber; correlation was found between Neuber's parameters and characteristics of subsoil; for usual periods of construction, diagram can be established giving correlations between subsoil's nature, its compressibility, and consolidation rate which permits prediction of total settling at building's completion.
Previsions et observations des tassements pour deux immeubles recents a Geneve
Prediction and observation of settling of two buildings in Geneva (Switzerland); calculations of subsoil settling were performed utilizing methods of Terzaghi and Kany, and observations as well as interpretation of data were done according to method developed by H. Neuber; correlation was found between Neuber's parameters and characteristics of subsoil; for usual periods of construction, diagram can be established giving correlations between subsoil's nature, its compressibility, and consolidation rate which permits prediction of total settling at building's completion.
Previsions et observations des tassements pour deux immeubles recents a Geneve
Previsions et observations des tassements pour deux immeubles recents a Geneve
Deriaz, P. (author)
1964
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Werk-Material - Technopark Zürich . Immeubles locatifs et commerciaux, rue Viollier, Genève
Online Contents | 1993
Budgets energetiques pour les immeubles de bureaux?
Taylor & Francis Verlag | 1981
|Online Contents | 2007
ROLE DES: COULEMENTS DANS LES TASSEMENTS AUTOUR DES TUNNELS
British Library Conference Proceedings | 1995
|