A platform for research: civil engineering, architecture and urbanism
Good supply of materials, use of modern equipment, and efficient organization are main factors in speed and efficiency of application of sand or grit to slippery road surfaces; charts show quantity of grit required to treat one mile of roadway, comparison of time involved in hand spreading and machine operation, and cost of treating one mile of road.
Good supply of materials, use of modern equipment, and efficient organization are main factors in speed and efficiency of application of sand or grit to slippery road surfaces; charts show quantity of grit required to treat one mile of roadway, comparison of time involved in hand spreading and machine operation, and cost of treating one mile of road.
Speeding up gritting operations
Surveyor
Vickers, T. (author)
1946
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Residents call for more gritting
British Library Online Contents | 2012
Winter gritting of road surfaces
Engineering Index Backfile | 1952
|Tarring and gritting of road surfaces
Engineering Index Backfile | 1911
|Winter Maintenance - Residents call for more gritting
Online Contents | 2012
High Skid-Resistant Pavements: The Effect of Gritting Parameters
Springer Verlag | 2024
|