A platform for research: civil engineering, architecture and urbanism
Regirdering Nari bridge, N. W. R. (India)
Details pertaining to regirdering of bridge 4 mi beyond Sibi; spans to carry 22 1/2-ton axle loads were designed and fabricated in railway workshops, and erected by railway staff; main girders are 18 ft deep, and each span, including its cast steel bearings, weighs 86 tons.
Regirdering Nari bridge, N. W. R. (India)
Details pertaining to regirdering of bridge 4 mi beyond Sibi; spans to carry 22 1/2-ton axle loads were designed and fabricated in railway workshops, and erected by railway staff; main girders are 18 ft deep, and each span, including its cast steel bearings, weighs 86 tons.
Regirdering Nari bridge, N. W. R. (India)
Ry Gaz
Railway Gazette ; 85
1946
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Refiguring the sketch : the Nari Gandhi cartographic.
Nari Ghadhi cartographic
DSpace@MIT | 2008
|Nārī bipathe yaẏa kena (2ẏa parba)
DataCite | 2015
|Jewel of India - NARI GANDHI Sumptuous and ecologically appropriate private house in Korjat
Online Contents | 1993
Rainfall Analysis of Typhoon TRAMI, TORAJI and NARI in Year 2001
British Library Conference Proceedings | 2004
|