A platform for research: civil engineering, architecture and urbanism
Reports on loading tests on large diameter underreamed bored pile
Pile of 500 tons working capacity was tested prior to construction of piled foundations on construction site of new West London Air Terminal; since primary purpose of test was to obtain information about settlement behavior of pile in working load range, it was decided to restrict test load to approximately one and half times working load; results, regarded as very satisfactory, indicate that "immediate" settlement of pile as tested, would be of 0.45 in.
Reports on loading tests on large diameter underreamed bored pile
Pile of 500 tons working capacity was tested prior to construction of piled foundations on construction site of new West London Air Terminal; since primary purpose of test was to obtain information about settlement behavior of pile in working load range, it was decided to restrict test load to approximately one and half times working load; results, regarded as very satisfactory, indicate that "immediate" settlement of pile as tested, would be of 0.45 in.
Reports on loading tests on large diameter underreamed bored pile
Civ Eng (Lond)
Fleming, W.G.K. (author) / Salter, T.H. (author)
1962
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Loading tests on underreamed bored pile
Engineering Index Backfile | 1960
|Experience in sinking bored, underreamed piles in the Ukraine
Online Contents | 1970
|Large-diameter bored pile hard layer construction method
European Patent Office | 2022
|Response of Laterally Loaded Large-Diameter Bored Pile Groups
British Library Online Contents | 2001
|Response of Laterally Loaded Large-Diameter Bored Pile Groups
Online Contents | 2001
|