A platform for research: civil engineering, architecture and urbanism
Main storage unit on Feather River, scheduled for completion in 1963, will have record 735 ft height above stream bed; rolled embankment will contain 77,000,000 cu yd of fill; design of embankment; slope determination; material size and compaction; instrumentation; river flow problems; transportation of material from borrow area to site.
Main storage unit on Feather River, scheduled for completion in 1963, will have record 735 ft height above stream bed; rolled embankment will contain 77,000,000 cu yd of fill; design of embankment; slope determination; material size and compaction; instrumentation; river flow problems; transportation of material from borrow area to site.
Oroville dam
Western Construction
Golze, A.R. (author)
Western Construction ; 37
1962
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1903
|Engineering Index Backfile | 1909
|Oroville Dam Vegetated Area Study
British Library Conference Proceedings | 2018
|Oroville: Response and Recovery
British Library Online Contents | 2017
|Engineering Index Backfile | 1904
|