A platform for research: civil engineering, architecture and urbanism
500 ft concrete span without centring
Bridge over River Medway will carry M2 motorway, and will have total length between abutments of 3272 ft; over river there will be central span of 500 ft, which includes freely supported span of 100 ft, and 2 side spans of 312 ft; diagrams, and information on form and erection are included. (see also Engineer v 213 n 5539 Mar 23 1962 p 521-5)
500 ft concrete span without centring
Bridge over River Medway will carry M2 motorway, and will have total length between abutments of 3272 ft; over river there will be central span of 500 ft, which includes freely supported span of 100 ft, and 2 side spans of 312 ft; diagrams, and information on form and erection are included. (see also Engineer v 213 n 5539 Mar 23 1962 p 521-5)
500 ft concrete span without centring
Engineering
Engineering ; 193
1962
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
500 ft concrete span without centring
Engineering Index Backfile | 1962
Adaptable steel centring for reinforced concrete bridges
Engineering Index Backfile | 1949
|"Hico" sectional steel centring
Engineering Index Backfile | 1951
"Hico" sectional steel centring
Engineering Index Backfile | 1951
Centring on the Olympic Fringe
British Library Online Contents | 2012
|