A platform for research: civil engineering, architecture and urbanism
Sea-tac main runway gets bituminous slurry seal treatment
Deterioration of asphaltic concrete overlay on Seattle-Tacoma International Airport's primary runway; temporary repairs were made in 24 hr shutdown, when seal was applied and cured; principal advantages of slurry seal were speed of application, minimum curing time and elimination of danger of loose rock being sucked into jet engines; material and application; difficulties; precautions.
Sea-tac main runway gets bituminous slurry seal treatment
Deterioration of asphaltic concrete overlay on Seattle-Tacoma International Airport's primary runway; temporary repairs were made in 24 hr shutdown, when seal was applied and cured; principal advantages of slurry seal were speed of application, minimum curing time and elimination of danger of loose rock being sucked into jet engines; material and application; difficulties; precautions.
Sea-tac main runway gets bituminous slurry seal treatment
Pac Bldr Engr
King, F.R. (author)
1962
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Bituminous runway construction
Engineering Index Backfile | 1942
|Airlift airfield gets heavy concrete runway
Engineering Index Backfile | 1950
|Recycling Bituminous Runway Pavement into Aggregate Base Course
British Library Conference Proceedings | 1991
|Concrete pavements on bituminous base courses in runway construction
Engineering Index Backfile | 1959
|Blistering Within Runway Bituminous Surfaces Evaluation and Remedial Action
British Library Conference Proceedings | 1995
|