A platform for research: civil engineering, architecture and urbanism
Method of underground construction of sewer drainage pipe of 2 m in diam under railway without disrupting operation of latter; method involves pressing in of concrete pipe equipped with special cutter-guide.
Method of underground construction of sewer drainage pipe of 2 m in diam under railway without disrupting operation of latter; method involves pressing in of concrete pipe equipped with special cutter-guide.
Special methods for construction of sewers
Spezielle Verfahren im Kanalbau
Kuntze, E. (author)
Gas- und Wasserfach ; 105
1964
7 pages
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1958
|Sewers : replacement and new construction
UB Braunschweig | 2004
|Drainage in construction of sewers
Engineering Index Backfile | 1949
|Sewers : replacement and new construction
TIBKAT | 2004
|New construction method for sewers
Engineering Index Backfile | 1951
|