A platform for research: civil engineering, architecture and urbanism
Design and construction of recently completed 4-km line of subway from Stettin to Anhalt railroad stations in Berlin, costing 173,000,000 marks; tunnel driving; description of new cars; organization of construction.
Design and construction of recently completed 4-km line of subway from Stettin to Anhalt railroad stations in Berlin, costing 173,000,000 marks; tunnel driving; description of new cars; organization of construction.
Die Berliner Nordsued-S-Bahn
Die Berliner Nordsued-S-Bahn
Grabski (author)
1937
12 pages
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
UB Braunschweig | 1935
|TIBKAT | 1935
|Geräuschemissionen der Berliner S-Bahn
IuD Bahn | 1998
|Fahrweginstandhaltung bei der Berliner U-Bahn
IuD Bahn | 1999
|Die Fahrleitungsanlage der Berliner S-Bahn
IuD Bahn | 1997
|