A platform for research: civil engineering, architecture and urbanism
Most cases of failure and over-design of piled foundations are due to shortcomings on one of following points: use of piles where they are unsuitable, choice of pile, design load, specification, technique of installing, and supervision; cases discussed.
Most cases of failure and over-design of piled foundations are due to shortcomings on one of following points: use of piles where they are unsuitable, choice of pile, design load, specification, technique of installing, and supervision; cases discussed.
Some notes on pile foundations
New Zealand Eng
Evison, R.D. (author)
1958
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1923
|Some aspects of pile foundations
Engineering Index Backfile | 1957
|Springer Verlag | 2017
|UB Braunschweig | 1961
|Engineering Index Backfile | 1888
|