A platform for research: civil engineering, architecture and urbanism
Most important actual problems of industrialized assembly construction of houses and plants from reinforced and unreinforced prefabricated parts
Present state of development of concrete technology, construction, transport, and assembly in Europe; stability, design, and other associated problems.
Most important actual problems of industrialized assembly construction of houses and plants from reinforced and unreinforced prefabricated parts
Present state of development of concrete technology, construction, transport, and assembly in Europe; stability, design, and other associated problems.
Most important actual problems of industrialized assembly construction of houses and plants from reinforced and unreinforced prefabricated parts
Die wichtigsten aktuellen Probleme des industrialisierten Montagebaues mit bewehrten und unbewehrten Betonfertigteilen fuer den Wohnungs- und Iindustriebau
Lewicki, E. (author)
1956
13 pages
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Industrialized Construction with SCC Obtaining Important Benefits
British Library Conference Proceedings | 2008
|Unreinforced ultra-high performance concrete prefabricated pipe pile and construction method thereof
European Patent Office | 2020
|