A platform for research: civil engineering, architecture and urbanism
Length of operative piping for hydraulic stowing in Polish collieries in 1955 amounted to 564 km; number of hydraulic stowing installations was 81 in 1955, and will rise to 95 in 1960; requirements of packing material rose to 24,000,000 m3 in 1955, and should reach 30,000,000 m3 in 1960.
Length of operative piping for hydraulic stowing in Polish collieries in 1955 amounted to 564 km; number of hydraulic stowing installations was 81 in 1955, and will rise to 95 in 1960; requirements of packing material rose to 24,000,000 m3 in 1955, and should reach 30,000,000 m3 in 1960.
Hydraulic stowing in Polish coal mines
Min J
Krupinski, B. (author)
Mining Journal ; 250
1958
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Hydraulic stowing experiment in New South Wales coal mine
Engineering Index Backfile | 1951
Hydraulic stowing in India: pressure studies in stowing ranges
Engineering Index Backfile | 1954
|Engineering Index Backfile | 1962
|Primary considerations in hydraulic stowing
Engineering Index Backfile | 1918
|Primary considerations in hydraulic stowing
Engineering Index Backfile | 1919
|