A platform for research: civil engineering, architecture and urbanism
3000 Tons rolled 250 feet
Moving of forestry building of University of Toronto; 60 ft high, 85×52 ft structure, was raised 42 in. to accommodate track beams and shoring and cribbing; holes were punched with concrete breakers at points where building was cut loose from its foundation; 17 steel beams were pushed through holes as first layer of support for building; moving of building by lateral jacks; completion of underpinning at new site.
3000 Tons rolled 250 feet
Moving of forestry building of University of Toronto; 60 ft high, 85×52 ft structure, was raised 42 in. to accommodate track beams and shoring and cribbing; holes were punched with concrete breakers at points where building was cut loose from its foundation; 17 steel beams were pushed through holes as first layer of support for building; moving of building by lateral jacks; completion of underpinning at new site.
3000 Tons rolled 250 feet
Eng Contract Rec
1958
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Trucks pile 20,000 tons 20 feet deep
Engineering Index Backfile | 1942
25 houses under 3000 square feet
UB Braunschweig | 2005
|25 houses under 3000 square feet
TIBKAT | 2005
|Electric hoists pull 3000-ton building 450 feet
Engineering Index Backfile | 1919