A platform for research: civil engineering, architecture and urbanism
Philippine bridge "Launched" horizontally
200 ft bridge truss span was shunted horizontally into place across narrow canyon in Batangas Province; steel truss "Utility Trust" span weighing 70 tons was constructed on site and provided with 136 ft long launching nose; bridge was rolled into place on rollers; no falsework was necessary; after launching nose was removed.
Philippine bridge "Launched" horizontally
200 ft bridge truss span was shunted horizontally into place across narrow canyon in Batangas Province; steel truss "Utility Trust" span weighing 70 tons was constructed on site and provided with 136 ft long launching nose; bridge was rolled into place on rollers; no falsework was necessary; after launching nose was removed.
Philippine bridge "Launched" horizontally
World Construction
de la Paz, D.F. (author)
World Construction ; 11
1958
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Dynamic response of horizontally curved bridge
Engineering Index Backfile | 1968
|Horizontally curved steel bridge seismic vulnerability assessment
Online Contents | 2012
|Horizontally Curved Steel Bridge Research - Update 2
British Library Conference Proceedings | 1994
|Horizontally curved steel bridge seismic vulnerability assessment
Elsevier | 2011
|