A platform for research: civil engineering, architecture and urbanism
Modern timber framing plant
Deck renewal project on Huey P. Long bridge of New Orleans Public Belt Railroad involves 42,498 pieces of which, 34,304 members are bridge ties; to control cost of preframing timbers, modern timber framing plant was built; plant is 36-ft × 100-ft Butler prefabricated building of rigid frame construction; its production line operation involves tapering, cutting, dapping, surfacing, and boring.
Modern timber framing plant
Deck renewal project on Huey P. Long bridge of New Orleans Public Belt Railroad involves 42,498 pieces of which, 34,304 members are bridge ties; to control cost of preframing timbers, modern timber framing plant was built; plant is 36-ft × 100-ft Butler prefabricated building of rigid frame construction; its production line operation involves tapering, cutting, dapping, surfacing, and boring.
Modern timber framing plant
Ry Track Structures
1958
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1916
|Online Contents | 1995
British Library Online Contents | 2010
|British Library Online Contents | 1996
|