A platform for research: civil engineering, architecture and urbanism
Two Santa Fe bridges have prestressed concrete girders
Method of constructing bridges to carry main track over two access roads near Colorado Springs; each bridge has two spans with four prestressed concrete girders per span; girders are 69 ft 10 in. long between centers of bearings and 71 ft 6 in. end to end, and 5 ft 11 in. in depth.
Two Santa Fe bridges have prestressed concrete girders
Method of constructing bridges to carry main track over two access roads near Colorado Springs; each bridge has two spans with four prestressed concrete girders per span; girders are 69 ft 10 in. long between centers of bearings and 71 ft 6 in. end to end, and 5 ft 11 in. in depth.
Two Santa Fe bridges have prestressed concrete girders
Ry Track Structures
1958
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Precast-prestressed concrete bridges. Pilot tests of continuous girders
Engineering Index Backfile | 1960
|Precast-Prestressed Concrete Bridges : 1. Pilot Tests of Continuous Girders
UB Braunschweig | 1960
|Precast-Prestressed Concrete Bridges : 4. Shear Tests of Continuous Girders
UB Braunschweig | 1961
|Design of continuous highway bridges with precast, prestressed concrete girders
Engineering Index Backfile | 1969
|Precast-Prestressed Concrete Bridges : 3. Further Tests of Continuous Girders
UB Braunschweig | 1960
|