A platform for research: civil engineering, architecture and urbanism
Efficient operation puts contractors ahead of schedule at Shilshole bay
4200 ft breakwater is composed of dredged material, gravel, intermediate-size rock, and armor rock in Seattle, Wash, harbor; 883, 000 cu yd of dredged material, and gravel obtained from other sources will be used; progress of work.
Efficient operation puts contractors ahead of schedule at Shilshole bay
4200 ft breakwater is composed of dredged material, gravel, intermediate-size rock, and armor rock in Seattle, Wash, harbor; 883, 000 cu yd of dredged material, and gravel obtained from other sources will be used; progress of work.
Efficient operation puts contractors ahead of schedule at Shilshole bay
Pac Bldr Engr
Ross, F.K. (author)
1958
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
MONITORING PUTS RESEARCHERS AHEAD OF DEVELOPMENT
British Library Online Contents | 2001
|British Library Conference Proceedings | 2011
|Partnering Puts Hyperion Project Back on Schedule
Online Contents | 1994