Controlled vibration in blasting at close quarters
Problem in second-stage construction of power plant of New York City Transit System was one of limited access and scheduling, large scale demolition, intricate rock excavation, and concrete construction inside operating power house; procedures required for blasting operations in intake and discharge tunnel extensions; vibrograph used throughout rock excavation work.
Controlled vibration in blasting at close quarters
Problem in second-stage construction of power plant of New York City Transit System was one of limited access and scheduling, large scale demolition, intricate rock excavation, and concrete construction inside operating power house; procedures required for blasting operations in intake and discharge tunnel extensions; vibrograph used throughout rock excavation work.
Controlled vibration in blasting at close quarters
Civ Eng (NY)
Samuels, R. (author)
1958
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Online Contents | 2000
|Driving batter piles in close quarters
Engineering Index Backfile | 1949
Building a railway station in close quarters
Engineering Index Backfile | 1930
|Pre-reinforcement and controlled blasting for close-in rock excavation
British Library Conference Proceedings | 2002
|Connection of close quarters to generalized turning points
TIBKAT | 1980
|