A platform for research: civil engineering, architecture and urbanism
New Oakland Airport
Fill for jet airstrip and terminal area of Metropolitan Oakland International Airport took 14 million cu yd of sand dredged from San Francisco Bay; sand fill averages about 12 ft deep; preparatory to filling 160,000 cu yd of mud were stripped away; sand dredging operations.
New Oakland Airport
Fill for jet airstrip and terminal area of Metropolitan Oakland International Airport took 14 million cu yd of sand dredged from San Francisco Bay; sand fill averages about 12 ft deep; preparatory to filling 160,000 cu yd of mud were stripped away; sand dredging operations.
New Oakland Airport
Pac Bldr Engr
1958
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1963
Mass production of shells for Oakland international airport
Engineering Index Backfile | 1962
|Concrete pipe used in drainage system of Oakland airport
Engineering Index Backfile | 1928
|TECHNICAL PAPERS - Earthquake Damage and Repair of Oakland Airport Runway
Online Contents | 2000
|Vulnerability Assessment of Perimeter Dike System at Oakland International Airport
British Library Conference Proceedings | 2009
|