120-ton rigs speed mica dam's fill
Construction of earth dam on Columbia River in BC; 120-ton Canadian-built bottom dump trailers are used to haul fill for 790-ft high embankment; flexibility of truck-loader combination favored it over materials handling by railroad or conveyor; loader is 15 cu yd unit; tractors are 700 hp with 8 1/2 ft diam wheels and 14-ft ladder for cab access; weak micaceous rock at dam prompted use of off-site material to build 42.2 million cu yd embankment of dam; corrugated pipe culverts, 36×24 ft, carry combined flows of rivers for haul road. (30042)
120-ton rigs speed mica dam's fill
Construction of earth dam on Columbia River in BC; 120-ton Canadian-built bottom dump trailers are used to haul fill for 790-ft high embankment; flexibility of truck-loader combination favored it over materials handling by railroad or conveyor; loader is 15 cu yd unit; tractors are 700 hp with 8 1/2 ft diam wheels and 14-ft ladder for cab access; weak micaceous rock at dam prompted use of off-site material to build 42.2 million cu yd embankment of dam; corrugated pipe culverts, 36×24 ft, carry combined flows of rivers for haul road. (30042)
120-ton rigs speed mica dam's fill
Eng News-Rec
Engineering News-Record ; 182
1969
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Rock-Fill Dam’s Void Deformation Monitoring
Trans Tech Publications | 2012
|Research and Application on Concrete Face Rock-Fill Dam's Earth-Rock Allocation
British Library Conference Proceedings | 2014
|Terminus dam's model excavation show
Engineering Index Backfile | 1960
Research and Application on Concrete Face Rock-Fill Dam’s Earth-Rock Allocation
Trans Tech Publications | 2014
|Dornau dam's new spillway performs
Online Contents | 1997