A platform for research: civil engineering, architecture and urbanism
Earth and rockfill dams -- Instrumentation and behaviour
Various instruments and devices used for construction of earth and rockfill dams and observations made on completed 123-m high Serre Poncon Dam in France and 155-m high Goscheneralp Dam in Switzerland; instrumentation study showed that settlement of faces which is maximum in upper portion of upstream face, takes place essentially when material is placed and during first cycle of filling and emptying of reservoir. (04367)
Earth and rockfill dams -- Instrumentation and behaviour
Various instruments and devices used for construction of earth and rockfill dams and observations made on completed 123-m high Serre Poncon Dam in France and 155-m high Goscheneralp Dam in Switzerland; instrumentation study showed that settlement of faces which is maximum in upper portion of upstream face, takes place essentially when material is placed and during first cycle of filling and emptying of reservoir. (04367)
Earth and rockfill dams -- Instrumentation and behaviour
Indian J Power River Val Develop
Khare, S.B. (author)
1968
13 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Instrumentation for earth and rockfill dams
TIBKAT | 1969
|Instrumentation of concrete faced rockfill dams
Online Contents | 1997
|Rockfill Dams: Dams With Sloping Earth Cores
ASCE | 2021
|