A platform for research: civil engineering, architecture and urbanism
Embankment stabilization at terminal island
Illustrated description of stabilization of portion of Pacific Coast Highway; method adopted on this project is to sink casing and jet material out; then holes are backfilled with clean coarse graded sand to allow for upward passage of water; data on vertical lift bridge spanning Cerritos Channel, and on other highway structures.
Embankment stabilization at terminal island
Illustrated description of stabilization of portion of Pacific Coast Highway; method adopted on this project is to sink casing and jet material out; then holes are backfilled with clean coarse graded sand to allow for upward passage of water; data on vertical lift bridge spanning Cerritos Channel, and on other highway structures.
Embankment stabilization at terminal island
Calif Highways Pub Works
1946
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Road Embankment and Slope Stabilization
NTIS | 2010
|Embankment Stabilization and Soil Mechanics
NTIS | 1980
|Embankment stabilization and soil mechanics
TIBKAT | 1980
|Cement Stabilization of Embankment Materials
NTIS | 2015
|