A platform for research: civil engineering, architecture and urbanism
Two postwar highway projects on U.S. 40 in solano county are well under way
First contract involves construction of two new lanes which, with existing two traffic lanes, will provide four-lane or divided concrete highway; second contract is on entirely new alignment and involves construction of four-lane highway; data on bridges; discussion of right of way problems and costs.
Two postwar highway projects on U.S. 40 in solano county are well under way
First contract involves construction of two new lanes which, with existing two traffic lanes, will provide four-lane or divided concrete highway; second contract is on entirely new alignment and involves construction of four-lane highway; data on bridges; discussion of right of way problems and costs.
Two postwar highway projects on U.S. 40 in solano county are well under way
Calif Highways Pub Works
Harding, P.O. (author)
1946
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
NTIS | 2000
|Online Contents | 1998
|Solano Benítez & Gloria Cabral
TIBKAT | 2020
|Engineering Index Backfile | 1943
|