A platform for research: civil engineering, architecture and urbanism
Clearing stream banks and swamps to make way for reservoirs presented many interesting situations; real economics were effected through use of special equipment and unique methods, wiring of timber in place being one of them; organization required for this task ran between 4000 and 5000 men.
Clearing stream banks and swamps to make way for reservoirs presented many interesting situations; real economics were effected through use of special equipment and unique methods, wiring of timber in place being one of them; organization required for this task ran between 4000 and 5000 men.
Reservoir clearing in Tennessee valley
Civ Eng (NY)
Davis, H.E. (author)
1946
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1939
Engineering Index Backfile | 1946
|Discussion on Tennessee Valley
ASCE | 2021
|Tennessee Valley emergency construction
Engineering Index Backfile | 1941
|NTIS | 1994