A platform for research: civil engineering, architecture and urbanism
Description of Long Beach, Calif, explosives-loading pier project involving war time shortages; construction features use of concrete pouring forms only for front face of quay wall, placement of quarried stone by floating derricks with wire rope slings, use of prefabricated pile assemblies, and provision for earthquake stresses; cost data.
Description of Long Beach, Calif, explosives-loading pier project involving war time shortages; construction features use of concrete pouring forms only for front face of quay wall, placement of quarried stone by floating derricks with wire rope slings, use of prefabricated pile assemblies, and provision for earthquake stresses; cost data.
Cyclopean pier construction
Eng News-Rec
Peel, K.P. (author)
Engineering News-Record ; 136
1946
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Uses of masses of cyclopean and semi-cyclopean masonry in construction of moles
Engineering Index Backfile | 1927
|Stability and drainage of cyclopean masonry dams
Engineering Index Backfile | 1931
|Theory and practice of cyclopean masonry
Engineering Index Backfile | 1930
|An 80-ft Dam of Cyclopean Masonry
Engineering Index Backfile | 1928
Theory and practice of cyclopean masonry
Engineering Index Backfile | 1931
|