A platform for research: civil engineering, architecture and urbanism
How carson moved 80 houses over 286 miles of mountain roads
Description of how Montana contractor, using specially built 103-ft trailers, successfully moved 80 housing units from Anaconda, Mont, to Pocatello, Idaho, to satisfy urgent housing need.
How carson moved 80 houses over 286 miles of mountain roads
Description of how Montana contractor, using specially built 103-ft trailers, successfully moved 80 housing units from Anaconda, Mont, to Pocatello, Idaho, to satisfy urgent housing need.
How carson moved 80 houses over 286 miles of mountain roads
Pac Bldr Engr
1946
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Complete bridge moved 22 miles
Engineering Index Backfile | 1932
|Big borrow loads moved over riverbed haul roads
Engineering Index Backfile | 1956
Engineering Index Backfile | 1946
Steel for new diesel facility [midline ellipsis] old boiler shop moved 335 miles
Engineering Index Backfile | 1952
British Library Online Contents | 1999