A platform for research: civil engineering, architecture and urbanism
Cast-in-place concrete pile tower footings provide good balance between theoretical requirements and maximum use of mechanized equipment for lowest possible footing cost; typical footing for 220-kv transmission tower costs approximately $110 per leg.
Cast-in-place concrete pile tower footings provide good balance between theoretical requirements and maximum use of mechanized equipment for lowest possible footing cost; typical footing for 220-kv transmission tower costs approximately $110 per leg.
Concrete piles make economical tower footings
Elec World
Lummis, J. (author)
Electrical World ; 126
1946
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Battered piles for economical tower foundations
Engineering Index Backfile | 1955
|Reinforced concrete piles with enlarged footings for underpinning a building
Engineering Index Backfile | 1904
|Seismic Design of Columns, Footings and Piles
British Library Conference Proceedings | 1986
|Large reinforced concrete piles prove more economical
Engineering Index Backfile | 1935
Templet for transmission tower footings
Engineering Index Backfile | 1931
|