A platform for research: civil engineering, architecture and urbanism
Davis Dam scheduled for 1949 completion
Report on construction of Davis Dam on Colorado River, Ariz; it is 3, 900,000 cu yd earth dam with central core of impervious material, layer of semi-pervious material on each side and final layer of larger rock to provide required mass; data on dam, diversion and forebay channel, outdoor-type power plant, sequence of operations, cost and capacity.
Davis Dam scheduled for 1949 completion
Report on construction of Davis Dam on Colorado River, Ariz; it is 3, 900,000 cu yd earth dam with central core of impervious material, layer of semi-pervious material on each side and final layer of larger rock to provide required mass; data on dam, diversion and forebay channel, outdoor-type power plant, sequence of operations, cost and capacity.
Davis Dam scheduled for 1949 completion
Eng News -- Rec
Engineering News-Record ; 137
1946
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Papers Scheduled at 1949 Section Meetings
Wiley | 1949
Maguga Dam scheduled for completion in 2001
British Library Online Contents | 2000
Oregon's Portland-Salem freeway scheduled for 1955 completion
Engineering Index Backfile | 1955
Incentives to Contractors : An Aid to Scheduled Completion of Construction Projects
British Library Conference Proceedings | 1995
|New exhibition building in Paris scheduled for substantial completion in 1959
Engineering Index Backfile | 1958