A platform for research: civil engineering, architecture and urbanism
Los Angeles-Long Beach harbors breakwater result of long planning
Contract awarded for construction of 8650 lin ft of detached breakwater and complete restoration of existing 12,500ft detached breakwater; constructional details; breakwater system will shelter harbor and coast from Cabrillo Beach in San Pedro to Belmont Pier in Long Beach and will be haven for expanded Pacific Fleet.
Los Angeles-Long Beach harbors breakwater result of long planning
Contract awarded for construction of 8650 lin ft of detached breakwater and complete restoration of existing 12,500ft detached breakwater; constructional details; breakwater system will shelter harbor and coast from Cabrillo Beach in San Pedro to Belmont Pier in Long Beach and will be haven for expanded Pacific Fleet.
Los Angeles-Long Beach harbors breakwater result of long planning
Pac Mar Rev
Berry, A.C. (author) / Peel, K. (author)
1946
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Long Beach-Los Angeles harbor breakwater
Engineering Index Backfile | 1933
|Pollution of Los Angeles and Long Beach harbors
Engineering Index Backfile | 1956
|Completed Los Angeles-Long Beach breakwater will be world's longest
Engineering Index Backfile | 1948
|