A platform for research: civil engineering, architecture and urbanism
Boulder dam -- Tailbay and tunnel portals altered
Illustrated description of alterations of tailbay and tunnel portals; work consists of excavating loose fill from river and canyon walls and altering outlet appurtenances of dam for purpose of improving hydraulic characteristics of flow through spillway tunnels; data on road relocation, operation schedule, tunnel construction and concrete pouring.
Boulder dam -- Tailbay and tunnel portals altered
Illustrated description of alterations of tailbay and tunnel portals; work consists of excavating loose fill from river and canyon walls and altering outlet appurtenances of dam for purpose of improving hydraulic characteristics of flow through spillway tunnels; data on road relocation, operation schedule, tunnel construction and concrete pouring.
Boulder dam -- Tailbay and tunnel portals altered
Western Construction News
Uehling, V.B. (author)
1946
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Monolithic concrete tunnel portals
Engineering Index Backfile | 1932
|Engineering Index Backfile | 1935
|Construction of Portals for Adits at Stillwater Mining Company's East Boulder Project
British Library Conference Proceedings | 2001
|Lining of Boulder (wickes) tunnel
Engineering Index Backfile | 1893
|Lining of Boulder (wickes) tunnel
Engineering Index Backfile | 1893
|