A platform for research: civil engineering, architecture and urbanism
Kanawha airport construction involves heavy grading
New airport near Charleston, W Va, involved nearly 10 million cu yd of excavation; details of construction, rock excavation, equipment and drainage given; 3 runways, up to 6000 ft long, will be paved to width of 150 ft with native stone base and bituminous concrete wearing surface.
Kanawha airport construction involves heavy grading
New airport near Charleston, W Va, involved nearly 10 million cu yd of excavation; details of construction, rock excavation, equipment and drainage given; 3 runways, up to 6000 ft long, will be paved to width of 150 ft with native stone base and bituminous concrete wearing surface.
Kanawha airport construction involves heavy grading
Pub Works
Public Works ; 77
1946
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1889
Concrete for Kanawha river project
Engineering Index Backfile | 1938
|Dual-lane highway involves heavy grading, unreinforced concrete pavement and bridge
Engineering Index Backfile | 1946
|Builds new bridge across Kanawha
Engineering Index Backfile | 1947
|Dual-lane highway involves heavy grading, unreinforced concrete pavement and bridge
Engineering Index Backfile | 1946
|