A platform for research: civil engineering, architecture and urbanism
Waterloo bridge -- Alteration of post office plant
Apr p 48-51: Demolition operations now being carried out at bridge, preparatory to commencement of work on construction of new bridge have necessitated extensive alterations to Departmental plant, and presented telephone engineer with unique problem in underground cable construction; operations consisted of two independent works on north and south sides respectively; work undertaken at Strand approach to bridge described. July p 103-4: Construction operations at south side of bridge.
Waterloo bridge -- Alteration of post office plant
Apr p 48-51: Demolition operations now being carried out at bridge, preparatory to commencement of work on construction of new bridge have necessitated extensive alterations to Departmental plant, and presented telephone engineer with unique problem in underground cable construction; operations consisted of two independent works on north and south sides respectively; work undertaken at Strand approach to bridge described. July p 103-4: Construction operations at south side of bridge.
Waterloo bridge -- Alteration of post office plant
Post Office Elec Engrs' J
Whenmouth, H. (author)
1937
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1938
TIBKAT | 1930
|British Library Online Contents | 1996
Engineering Index Backfile | 1942
Online Contents | 1996