A platform for research: civil engineering, architecture and urbanism
Contractor handles tough problems in driving horse Mesa dam spillway tunnel
Sheer cliff blasting near existing dam and powerhouse, restriction as to reservoir levels and other difficulties encountered in construction of large diameter tunnel spillway; camp and plant; major units of equipment; lining program.
Contractor handles tough problems in driving horse Mesa dam spillway tunnel
Sheer cliff blasting near existing dam and powerhouse, restriction as to reservoir levels and other difficulties encountered in construction of large diameter tunnel spillway; camp and plant; major units of equipment; lining program.
Contractor handles tough problems in driving horse Mesa dam spillway tunnel
West Construction News
1937
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Online Contents | 2005
Engineering Index Backfile | 1928
Floor renovation handles tough exposures
British Library Online Contents | 1999
Interesting construction at horse Mesa dam
Engineering Index Backfile | 1937
|Bumbuna Falls spillway tunnel modelling
Online Contents | 1994