A platform for research: civil engineering, architecture and urbanism
Why desilting works for all-American canal?
Origin of 70,000 tons of silt per day which desilting works at Imperial Dam are designed to remove; silt content curves of Colorado River; silt sampler; retrogression of river bed; amount and character of silt load at Imperial Dam site before and after closure of Boulder Dam.
Why desilting works for all-American canal?
Origin of 70,000 tons of silt per day which desilting works at Imperial Dam are designed to remove; silt content curves of Colorado River; silt sampler; retrogression of river bed; amount and character of silt load at Imperial Dam site before and after closure of Boulder Dam.
Why desilting works for all-American canal?
Eng News-Rec
Vetter, C.P. (author)
Engineering News-Record ; 118
1937
6 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.