A platform for research: civil engineering, architecture and urbanism
Concrete rehabilitation work on Uncompahgre Project
Condition of 4-mi concrete lined section of South Canal of Uncompahgre Project after 30 yr of operation; effect of swelling shale on sidewalls and floor; repairing of lining with gunite; design and construction of new canal lining.
Concrete rehabilitation work on Uncompahgre Project
Condition of 4-mi concrete lined section of South Canal of Uncompahgre Project after 30 yr of operation; effect of swelling shale on sidewalls and floor; repairing of lining with gunite; design and construction of new canal lining.
Concrete rehabilitation work on Uncompahgre Project
Am Concrete Inst -- J
Reeves, A.B. (author)
1937
8 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
NTIS | 1994
|Taylor Park Dam Uncompahgre Project, Colorado
Engineering Index Backfile
The Gunnison tunnel of the Uncompahgre irrigation project
Engineering Index Backfile | 1906
|The gunnison tunnel of the uncompahgre valley project, United States reclamation service
Engineering Index Backfile | 1909
|