A platform for research: civil engineering, architecture and urbanism
Earthwork and structures Contra Costa Canal Station 2 + 00 to Station 208 + 50
Schedule, specifications, and drawings for construction of 20,650 ft of irrigation canal about 24 ft bottom width and about 20 ft average depth, involving total excavation of 640,000 cu yd, for Contra Costa division, Central Valley project, near Oakley, Calif.
Earthwork and structures Contra Costa Canal Station 2 + 00 to Station 208 + 50
Schedule, specifications, and drawings for construction of 20,650 ft of irrigation canal about 24 ft bottom width and about 20 ft average depth, involving total excavation of 640,000 cu yd, for Contra Costa division, Central Valley project, near Oakley, Calif.
Earthwork and structures Contra Costa Canal Station 2 + 00 to Station 208 + 50
U S Bur Reclamation -- Specifications
1936
35 pages
6 Supp plates
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Earthwork, concrete lining, and structures station 1993 + 11 to station 2321 + 25 contra costa canal
Engineering Index Backfile | 1941
Earthwork and structures -- Vale main canal station
Engineering Index Backfile | 1930
Earthwork, tunnels, and structures, Casper canal, station 0 to station 190
Engineering Index Backfile | 1934
Earthwork all-American canal station 245 to station 1860
Engineering Index Backfile | 1934
Earthwork and structures, Vale main canal, station 2450-00
Engineering Index Backfile | 1934