A platform for research: civil engineering, architecture and urbanism
Model study of maintenance works at Ballona Creek outlet, Venice, California
Hydraulic laboratory model tests of proposed outlet works of Ballona Creek lagoon at Venice, Calif, to be designed for max discharge of 40,500 cu ft per sec. (70¢)
Model study of maintenance works at Ballona Creek outlet, Venice, California
Hydraulic laboratory model tests of proposed outlet works of Ballona Creek lagoon at Venice, Calif, to be designed for max discharge of 40,500 cu ft per sec. (70¢)
Model study of maintenance works at Ballona Creek outlet, Venice, California
U S Waterways Experiment Station -- Paper
1937
44 pages
Report
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Water Quality Modeling of Ballona Creek and the Ballona Creek Estuary
British Library Conference Proceedings | 2000
|Metals TMDL Modeling for Ballona Creek in California
British Library Conference Proceedings | 2007
|Outlet works, Black Butte dam Stoney creek, California
Engineering Index Backfile | 1960
|