A platform for research: civil engineering, architecture and urbanism
Grand Coulee Cofferdam removal
Methods used in demolition of cofferdam for construction of Grand Coulee Dam; excavation totals; steel sheeting pulled by cranes and timber cribs uprooted by power shovels.
Grand Coulee Cofferdam removal
Methods used in demolition of cofferdam for construction of Grand Coulee Dam; excavation totals; steel sheeting pulled by cranes and timber cribs uprooted by power shovels.
Grand Coulee Cofferdam removal
Eng News-Rec
Engineering News-Record ; 119
1937
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Serious leak checked in cofferdam at grand coulee
Engineering Index Backfile | 1937
Cofferdam 3,000 Ft. long built at grand coulee
Engineering Index Backfile | 1935
Engineering Index Backfile | 1938
Engineering Index Backfile | 1942
Engineering Index Backfile | 1938