A platform for research: civil engineering, architecture and urbanism
Selby smelter now has world's tallest stack
Construction of reinforced concrete chimney 605 ft 9 in. high from top of foundation slab to crown of shaft; field work was completed in about 244 days.
Selby smelter now has world's tallest stack
Construction of reinforced concrete chimney 605 ft 9 in. high from top of foundation slab to crown of shaft; field work was completed in about 244 days.
Selby smelter now has world's tallest stack
Eng Min J
1937
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Report of the Selby smelter commission
Engineering Index Backfile | 1916
|World's tallest welded building
Engineering Index Backfile | 1930
|Engineering the World's Tallest
British Library Conference Proceedings | 2008
|World's tallest prestressed concrete building
Engineering Index Backfile | 1965
World's tallest building in lightweight concrete
Engineering Index Backfile | 1967