A platform for research: civil engineering, architecture and urbanism
Driving waldo approach tunnel
Building of 4-lane 1000-ft tunnel for approach to Golden Gate Bridge; driving method included use of 3 drifts, ring stoping and temporary steel rib supports; tunnel design; major equipment; concreting; removal of core.
Driving waldo approach tunnel
Building of 4-lane 1000-ft tunnel for approach to Golden Gate Bridge; driving method included use of 3 drifts, ring stoping and temporary steel rib supports; tunnel design; major equipment; concreting; removal of core.
Driving waldo approach tunnel
Western Construction News
1937
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Lessons from the Waldo Canyon Fire
British Library Conference Proceedings | 2013
|WILDLAND/URBAN INTERFACE - AFTER WALDO CANYON
Online Contents | 2012
|Oregon. Llano De Oro placers, Waldo district, Oregon
Engineering Index Backfile | 1928
|Emergency Suspension Cable Reinforcement of Waldo Hancock Bridge
British Library Conference Proceedings | 2005
|