A platform for research: civil engineering, architecture and urbanism
Reconstruction and widening of Margaret bridge over Danube at Budapest
Reconstruction of steel arch bridge completed in 1876, consisting of six hingeless wrought iron arch girders, 255 ft to 336 ft long, including widening of its roadway from 36 ft 10 in to 55 ft; construction of four pedestrian tunnels crossing roadway. (new series)
Reconstruction and widening of Margaret bridge over Danube at Budapest
Reconstruction of steel arch bridge completed in 1876, consisting of six hingeless wrought iron arch girders, 255 ft to 336 ft long, including widening of its roadway from 36 ft 10 in to 55 ft; construction of four pedestrian tunnels crossing roadway. (new series)
Reconstruction and widening of Margaret bridge over Danube at Budapest
Structural Engr
Szechy, C. (author)
Structural Engineer ; 15
1937
18 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
3 in 1 reconstruction of monument Margaret Danube-bridge in Budapest, Hungary
British Library Conference Proceedings | 2013
|The Schwurplatz bridge over the Danube at Budapest
Engineering Index Backfile | 1902
|The Schwurplatz bridge over the Danube at Budapest
Engineering Index Backfile | 1899
|The Budapest New Danube Bridge
DataCite | 2024
|Reconstruction of bridges over Danube River in Budapest, Hungary
Engineering Index Backfile | 1947
|