A platform for research: civil engineering, architecture and urbanism
May 8: Design and construction of welded plate girder bridge consisting of three spans 63 m to 99 m long, carrying German superhighway over Oder River, near Stettin. May 21: Steel works; construction of foundation; description of inspection car. (see also Bauingenieur v 18 n 19/20 and 21/22 May 8 p 247-52 and May 21 p 302-14)
May 8: Design and construction of welded plate girder bridge consisting of three spans 63 m to 99 m long, carrying German superhighway over Oder River, near Stettin. May 21: Steel works; construction of foundation; description of inspection car. (see also Bauingenieur v 18 n 19/20 and 21/22 May 8 p 247-52 and May 21 p 302-14)
Die Oderbruecke im Zuge der Reichsautobahn Berlin -- Stettin
Die Oderbruecke im Zuge der Reichsautobahn Berlin -- Stettin
Worch, G. (author)
1937
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Die Oderbruecke im Zuge der Reichsautobahn Berlin -- Stettin
Engineering Index Backfile | 1937
|Die Oderbruecke im Zuge der Reichsautobahn Berlin -- Stettin
Engineering Index Backfile | 1937
|Die Oderbrücke im Zuge der Reichsautobahn Berlin-Stettin
UB Braunschweig | 1937
|Die Oderbrücke im Zuge der Reichsautobahn Berlin-Stettin
TIBKAT | 1937
|Bereitstellung der Baustoffe fuer die Betondecken der Reichsautobahn Berlin -- Stettin
Engineering Index Backfile | 1938
|